NORRAHAMMAR
Metal construction installation and sandwich panel assembly, for the construction of the second floor
In the project Norrahammar, Sweden SIA M BOOM performs the installation of metal structures and sandwich panels, as well as the installation of all special elements for the complete construction of the facility. The following works were performed:
- dismantling of the existing roof,
- MKR development,
- procurement and delivery of materials to the object,
- metal structure installation,
- installation of wall and roof sandwich panels,
- window installation, interior / exterior decoration,
- snow barriers, installation of water drainage systems.
Location: Norrhammar, Sweden
Timeframe: December 2019 – March 2020
Client: Legal entity











